Re-cladding of an existing building removing Aluminium Composite Material (ACM), insulation and cement particle board and replacement with new 3mm aluminium cladding and associated works.

  • Budget:£11,000,000
  • Client:Catalyst Housing
  • Concept Architect:PRP Architects
  • Agent:PRP Architects

Re-cladding of an existing building removing Aluminium Composite Material (ACM), insulation and cement particle board and replacement with new 3mm aluminium cladding and associated works.

The works are located on a project called First Central Block C that we completed in 2015.The works were fully compliant with Building Regulations at the time. These comprised of 138 mixed tenure units of one, two and three bedroom apartments; 70 shared ownership and 68 affordable rent.

The project involves Re-cladding of an existing building, removing Aluminium Composite Material (ACM), insulation and cement particle board. Design, supply and installation of a replacement system comprising new 3mm aluminium cladding and associated works. All products were A1 fire-rated.